Processing Guides

Process Gallery

Carbon fiber plies being laid onto a mold surface
Ply lay-up — illustrative image
Composite material inside a pressure vessel
Cure under pressure — illustrative image
Narrow prepreg tape spools on a slitting spindle
Slitting and spooling — illustrative image
Continuous carbon fiber tow being wound on a mandrel
Filament winding — illustrative image

A material is only as good as the process it enters. These guides cover how our fabrics and prepregs behave in the main molding routes, and the mistakes that most often cost a trial program its result.

Choosing a Processing Route

Process Suitable materials Typical use Watch out for
Hand lay-up Fabrics with loose weave; prepregs with long out-time Prototypes, low volume, large parts Resin-rich areas and voids if wet-out is rushed
Vacuum bagging Prepregs; fabrics with compatible resin Medium volume, good quality-to-cost ratio Vacuum leaks, resin flow paths, insufficient drainage
Autoclave Thermoset prepregs (epoxy, BMI) Structural parts, aerospace-grade quality Pressure cycling and porosity control
Press / thermoforming Thermoplastic prepregs and laminates Short cycle, high volume, flat panels Heating uniformity — cold spots cause incomplete consolidation
Automated tape placement / winding UD tows, UD prepreg tapes Large structures, pipe, closed sections Tension control and compaction

Consolidation Is Where Quality Is Won or Lost

For thermoplastic processing in particular, consolidation is the decisive step: the material is heated to melt the matrix, pressure is applied, and the layers must fuse into a single solid. Most defects in finished parts trace back to insufficient or uneven consolidation during this stage rather than to the material itself.

  • Bring the whole stack to temperature uniformly — a partially cold laminate will not consolidate, and the bond lines remain weak
  • Apply pressure after the matrix has begun to flow, not before — pressing a cold laminate simply locks in the geometry and traps the gaps
  • Hold pressure through cooling to full solidification; early release creates residual voids

Common Failure Modes

Problem Likely cause What to change
Voids / porosity Incomplete impregnation, air trapped in lay-up, moisture Improve wet-out sequencing; dry materials; use vacuum or pressure
Dry spots / resin-rich areas Insufficient resin flow or poor compaction Increase pressure and hold time; check resin content matches design
Delamination between plies Contamination, insufficient tack or incomplete consolidation Keep surfaces clean; check out-time; verify consolidation temperature
Fiber waviness Tow tension too high during lay-up or winding Reduce tension; use tension control on winding equipment
Twist and drape difficulty Tow grade too heavy for the geometry Move to a lower filament count for better drape

Storage Before You Process

Thermoset prepregs are stored frozen or refrigerated to hold shelf life, and every roll carries an out-time budget. Thermoplastic prepregs need no cold storage but do need to stay dry and clean. Both topics are covered in detail in our article on material selection and in the storage guidance on our technical blog.

Need a Process Recommendation?

Tell us the part geometry, target cycle time, available equipment and annual volume on the contact page. We will tell you which material and which process fit — including when the honest answer is that a simpler process will give you a better part.

Scroll to Top

联系我们 / Contact Us

丹阳理兴碳素制品有限公司
Danyang Lixing Carbon Products Co., Ltd.

地址 Address中国江苏丹阳市云阳街道南三环路丹阳高新技术创新园 212300
网址 Weblxcomposites.com
工作时间 Hours周一至周五 8:30-18:00